Formerly known as Selan Exploration Technology Limited Formerly known as Selan Exploration Technology Limited Formerly known as Selan Exploration Technology Limited Formerly known as Selan Exploration Technology Limited Formerly known as Selan Exploration Technology Limited Formerly known as Selan Exploration Technology Limited

Lohar Field
(Cambay Basin)

The Lohar Field, is located in the Cambay Basin, lies about 35 km northwest of Ahmedabad and spans 5 sq. km. The Field was awarded under the Pre-NELP discovered round, its PSC was signed on March 13, 1995.

The Company operates the field with a 100% participating interest, targeting the K-III reservoir of the Kalol Formation (Middle Eocene). Since taking possession in October 1995, the Company has implemented 2D and 3D seismic interpretation, well drilling, surface facility upgrades—including an Effluent Treatment Plant (ETP) and continuous production optimization.

Lohar

Field Area

~ 5 sq. km.

Licensing Round

Pre-NELP Discovered Small Field

PSC Signing Date

March 13, 1995

Participating Interest

100%

PSC Validity Date

March 12, 2030

Operator

Antelopus Selan Energy Limited

Reservoir

K-III (Kalol Formation)

Asset Location

Gujarat, Near Ahmedabad

Reservoir Depth

1200 - 1400m

Field Life Cycle

Production

Sales FY' 25

~ 26,125 boe